Furnace duct soffit

Saturday, March 29th, 2008

With most of the taping and mudding complete I have started building some soffit around furnace ductwork. There are two areas this will have to be constructed. Pictured here is a duct in the workshop that feeds a first floor register. The other area will be the large return ducts in the media room.

 

basement-003.JPG basement-004.JPG
Duct to cover Framework to hold drywall

The framework is constructed from 2×4’s ripped lengthwise to form a piece 1 1/2 x 1 3/4 and 5.2mm underlayment crosspieces. Once the framework is secured to the floor joists to surround the duct, drywall will be attached to complete the soffit.

husky-air-compressor.jpg

Thanks to a new air compressor (special $49, down from $99) from Home Depot and a Bostich air stapler (borrowed, thanks Dad!) the soffit building went really quick.

Neat bot

Wednesday, March 19th, 2008

http://www.geology.smu.edu/~dpa-www/robo/jbot/

Tape and mud

Sunday, March 16th, 2008

Did you ever start a project and then wish you had just written someone a check?

🙂

basement-029.JPG basement-030.JPG basement-031.JPG
First corners Long wall, taped more tape
     
basement-033.JPG basement-034.JPG basement-036.JPG
workshop started plumbing box bathroom